AA EnvironmentalAA EnvironmentalAA EnvironmentalAA Environmental
  • Home
  • About
  • Services
  • Projects
  • Contact Us

A380 South Devon Link Road

    Home Portfolio A380 South Devon Link Road
    NextPrevious

    A380 South Devon Link Road

    February 25, 2016
    0

    Construction Environmental Management

    AAe were contracted to oversee the environmental management of the construction works. AAe provided the Project Environmental Manager, Environmental Clerk of Works and Ecological Clerk of Works. The team were responsible for:

    • •  the development of the Construction of Environmental Plans;
    • •  obtaining all temporary consents for the project;
    • •  implementation of the management systems including assisting construction teams with the control of noise and vibration and dust emissions;
    • •  assisting the project team on the regulatory issues associated with material management. The Project one the gold award for material re-use on the Project;
    • •  project managing the environmental issues with the diversion of Aller Brook including the translocation of some 143 fish including trout and lamprays;
    • •  developing Material Management Plans to enable materials to be imported between sites and the use of material to enable land improvement; and route wide ecological clearance, hedgerow and orchid rich soil translocation and protection of important species.

     

    Noise

    Noise assessment was integrated into the development of the working programme and community liaison process. Due to the nature of construction activities had to be completed in sensitive periods including 24 hour working over Christmas. AAe assessed noise levels, implemented mitigation and monitored compliance. In total over 30 s61 consent submissions were submitted and approved by Councils to enable works to continue without the prospect of enforcement.

    Dusts, vapours and asbestos

    Development of management plans and monitoring systems to the levels of fugitive dusts were understood and actions suitably taken. Works included an assessment of the levels of crystalline silica within fugitive dusts.

    Pollution control

    Groundwater level and quality was assessed during the construction of a deep cutting adjacent to a landfill to ensure there was no discernible change in the groundwater regime and quality.

    Surface waters were routinely assessed to determine the presence of suspended solids and other pollutants throughout the 3 year construction period.

    Category:
    Air Quality and Noise, Construction Environmental Management
    Tags:
    Construction Environmental, Dusts, Noise, Pollution Control

    Related Projects:

    Replacement Forth Crossing

    construction environmental dusts flood risk

    View more

    Replacement Forth Crossing

    construction environmental dusts flood risk

    Replacement Forth Crossing

    construction environmental dusts flood risk

    Replacement Forth Crossing
    2016-02-25

    A380 South Devon Link Road

    construction environmental dusts noise pollution control

    View more

    A380 South Devon Link Road

    construction environmental dusts noise pollution control

    A380 South Devon Link Road

    construction environmental dusts noise pollution control

    A380 South Devon Link Road
    2016-02-25

    Kincardine Road Bridge Crossing

    construction environmental flood risk

    View more

    Kincardine Road Bridge Crossing

    construction environmental flood risk

    Kincardine Road Bridge Crossing

    construction environmental flood risk

    Kincardine Road Bridge Crossing
    2015-11-09

    M74 Completion

    construction environmental

    View more

    M74 Completion

    construction environmental

    M74 Completion

    construction environmental

    M74 Completion
    2015-11-09
    Website Design and IT Support by Computer Assistance | All Rights Reserved
    • Home
    • About
    • Services
    • Projects
    • Contact Us
    AA Environmental