Flood risk and outline drainage designs were completed for 3 areas of Stoke Park. The design mitigated flood displacement and ensured SUDs measures were fully incorporated into the drainage achieving greenfield run-off rates. The drainage design incorporated BRE Digest 365 compliant infiltration tests.